Tel: +86-372-3175078
E-mail: aydwyj@dwyjgs.com

Contact
ATTN: Li Xin
E-MAIL: aydwyj@dwyjgs.com
TEL: +86-372-3175078
Address: West Of Mengjia Village Road, Longqu Road, Long'an District, Anyang City, Henan Province

Production Process And Equipment Arrangement Of CaSi Cored Wire

            (1) Production process and equipment layout: Production Workshop of various equipment must be in accordance with product requirements of the process of reasonable emissions, so that all stages of semi-finished products, sequentially flow. Equipment configuration to consider the production efficiency of the balance of productivity, some equipment may have to be equipped with two or more units in order to make the production line balance. Thus the reasonable selection of equipment and the layout of the production site, must be based on product and output to balance the comprehensive consideration.CaSi Cored Wire

         (2) Production organization management: Production organization management must be scientific and reasonable, careful and accurate, strict and meticulous, the operator must be meticulous in accordance with the requirements of the process, any one link problems, will affect the smooth process, the quality of products and delivery. In particular, multi-core cable, a certain line or basic unit length is short, or the quality of the problem, the whole cable will not be long enough, resulting in scrap. Conversely, if the length of a unit is too long, it must be sawed to cause waste.CaSi Cored Wire

          (3) Quality Management: Large-length continuous superposition of the combination of production, so that any one link, instantaneous occurrence of one problems, will affect the quality of the whole cable. The more the quality defects occur in the inner layer and the failure to terminate production in time, the greater the damage. Because the production of wire and cable is different from that of assembled products, it is possible to disassemble and replace another piece; the quality of any part or process of a wire and cable is almost irreparable and irreparable to this cable. After the treatment is very negative, either saw short or degraded processing, or scrap the entire cable. It cannot disassemble and reload.

The quality management of wire and cable must run through the whole production process. The Quality Management Inspection Department should inspect the whole production process, the operator self-inspection, the upper and lower process mutual inspection, which is the important guarantee and means to guarantee the product quality and improve the enterprise's economic benefit.CaSi Cored Wire